Project: Replacement folding shutter door
Project: Replacement Folding shutter door
Client: Gatwick Group
Site: Rutherford Way, Manor Royal, Crawley
CJ Maintenance Was awarded the Contract at one of The Gatwick Groups depots to replace one manual operation bi parting folding shutter door. CJ Maintenance Ltd Engineers carried out all aspects of the job from stripping out the existing damaged floor track, concreting in the new floor track and installing the new door.
The new door was installed with additional extras of 2no 3 phase 400v electric industrial motors. The door was to fit a structural opening size of 11500mm wide x 5000mm high all parts was finished in galvanized steel